Phase 1 · Entry Phase 2 · The decisions Phase 3 · The through-line Phase 4 · Reflection
Activity 3 · 10 to 12 minutes

Leading the M&E

You are the M&E lead for your country's Child Guarantee plan. You have a small team and a limited budget. The Ministry of Finance asks for results fast. Over the next 36 months you will make five decisions. Each is tricky: the option that looks right under pressure can bring additional costs later.

The M&E lead at her desk, studying a 36-month timeline on the wall with five decision points marked
The decisions · five decisions, 36 months, one system to build

How this works

For each decision you will choose one of three options, then see how it plays out over the months that follow. There is no going back after you choose, but you can replay the entire scenario at the end.

The timeline marks the five decision points, from month 1 to month 30 of 36.

Decision 1 of 5 · Month 1 · First priority

The plan is signed. You have a three-person team. The Minister wants a public dashboard in six months, before the summit.

What do you do in these six months?

Choose an option to continue.
Decision 2 of 5 · Month 4 · Indicator design

Governance is forming. You need indicators. A ready-made list is available; your team is stretched.

How do you build the indicator set?

Choose an option to continue.
Decision 3 of 5 · Month 10 · Data quality

Data are coming in from three ministries. Some figures look implausible. Fixing this will slow reporting.

What do you do about data quality?

Choose an option to continue.
Decision 4 of 5 · Month 18 · Evaluation

The Ministry of Finance wants proof the measures work. There is budget for one evaluation.

What evaluation do you commission?

Choose an option to continue.
Decision 5 of 5 · Month 30 · Evidence use

You have two years of data and a dashboard is nearly ready. The next reporting cycle is approaching.

How do you make the evidence count?

Choose an option to continue.
The through-line · five decisions, one pattern

Seen together, the five strong choices trace a single line

Governance before tools, logic before data, quality by design, evaluability before evaluation, and evidence-use before public dashboards. In every case the high-risk option was the one that looked most responsive under pressure. The countries that built M&E systems that lasted resisted exactly those shortcuts.

Strong Viable, with conditions High risk
Reflection · a reflective pause

Apply this to your context

  • Which of these five decisions are you facing right now?
  • Where is the pressure in your own system pushing you toward the plausible shortcut, and how could you resist it?
Two colleagues stepping back from a finished planning board, reviewing the work together
Take this to your team: leading the M&E

Leading an M&E system means making the unpopular decisions first. Under pressure, the responsive choice, the quick dashboard, the ready-made indicators, the big evaluation, is usually the one that brings more costs. These are the five decisions that determine whether the system reports or learns. Tick the ones you are facing now.

The five decisions

  • Governance before tools. Run the diagnostic and build two-tier governance before making anything visible. Resist: the dashboard before the summit.
  • Logic before data. Write a theory of change first, then draw indicators from the results chain. Resist: the indicators for which the data already exist.
  • Quality by design. Build verification and auditing into the routine to ensure credibility. Resist: reporting unchecked data because the systems are official.
  • Evaluability before evaluation. Check the measures are evaluable before commissioning the evaluation. Resist: the full impact evaluation before an evaluability assessment.
  • Evidence use before dashboards. Set a standing governance moment where evidence is reviewed and acted on. Resist: publishing the dashboard and moving on.

Put these to your team

  • Which of these five are we facing right now?
  • Where is the pressure pushing us toward the plausible shortcut, and who is applying it?
  • What would doing the unpopular thing first look like this quarter?
This is the final activity in the M&E companion module. You have mapped the components, sequenced the roadmap, and led the decisions.Back to the brief